Old Barns, Oxfordshire
Study Case
Refurbishment and construction works to a grade II property.
This project outlines the construction of an independent portal frame glass/steel roof, featuring a full-width/height double sliding glazed door system (approx. 6.1m x 2.1m). A provisional sum of £50,000 was allocated for specialist supply and installation, covering all ancillary works, with overhead and profit included in the summary.
£81k
Budget
2023
Year
160m²
Size
16 weeks
Duration
Mo Nimba
Manager

Project Management
The works involve constructing a bespoke glass and steel roof with a full-width, double sliding glazed door system (6.1m x 2.1m) for a Grade II listed property. Specialist fabrication and installation are required, ensuring compliance with British Standards and statutory regulations. The contractor must manage site safety, temporary protection, and coordination with authorities. The project is overseen by Adelaide Jones, with Woldon London as lead architect and Jampel Davison & Bell Limited as structural engineer.

See other projects
Project Management to include Major Refurbishment, General Repairs and Decorations and Planning Consents.
Contact Us
Any questions?
Get in touch any time for more information about any of the services we offer, or to get a free, no obligation quote.


